Stabilizer rib construction jig

[caption id="attachment_5162" align="aligncenter" width="225" caption="Eric Rivers, a new volunteer working on stabilizer rib jig."][/caption]

Completed wing ribs, only 50 or so more to build.

[caption id="attachment_5160" align="aligncenter" width="300" caption="Strutter control yoke"][/caption][
Construction of the Strutter continues. Due to the Holidays and the extreme cold weather we have experienced here in the South, work has been a little slow on the project, though many small parts are still being made. The Horizontal stabilizers many wood parts are being built at this time. We are waiting for the drawings of the metal parts to be completed and then we can start manufacturing the parts and assembling the stabilizer.

Leave a Reply